1357 5th Residential Development
Sector: Cement • Location: Oakland, California, United States of America
Source: Dodge
A multifamily, five-story residential facility with 421 dwelling units. The project will also include 720 off-street parking spaces in an eight-story, detached garage for residential and BART parking. Includes an approximately 5,500 square foot amenity building
- Status
- Failure
- Sector
- Cement, Commercial, Car parking, Automotive, Residential, Road, Manufacturing (Industrial)
- Location
- Oakland, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 1357 5th Residential Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A multifamily, five-story residential facility with 421 dwelling units. The project will also include 720 off-street parking spaces in an eight-story, detached garage for residential and BART parking. Includes an approximately 5,500 square foot amenity building |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Oakland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Car parking, Automotive, Residential, Road, Manufacturing (Industrial) |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
