13A Master Lift Station Upgrade
Sector: Water Supply and Storage • Location: Bradenton, Florida, United States of America
Source: Dodge USA
Remove pumps, piping, and appurtenances from the drywell, remove the grinder system, lighting fixtures, and all fiberglass platform and railings from the wetwell and demo the above-ground level and the concrete dividing wall between the wetwell and drywell to create one open concrete pit. Utilize the open structure to construct a new concrete wetwell within that open cavity and backfill the remain
- Status
- Prospective
- Sector
- Water Supply and Storage, Rail, Waste Processing and Treatment, Commercial, Power Transmission, Cement, Government, Power Generation (CCGT)
- Location
- Bradenton, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 13A Master Lift Station Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove pumps, piping, and appurtenances from the drywell, remove the grinder system, lighting fixtures, and all fiberglass platform and railings from the wetwell and demo the above-ground level and the concrete dividing wall between the wetwell and drywell to create one open concrete pit. Utilize the open structure to construct a new concrete wetwell within that open cavity and backfill the remaining voids. Install discharge piping, guide rails, pipe bracing, base ells, and riser piping per o... |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Bradenton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Waste Processing and Treatment, Commercial, Power Transmission, Cement, Government, Power Generation (CCGT) |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
