logo

13th Street Bridge Replacement Project

Sector: Bridge

Source: MSN

Project
Planned

The 13th Street Bridge replacement project is currently on hold and is scheduled to resume in 2028. This project aims to replace the existing bridge to improve safety and traffic flow.

Status
Prospective
Sector
Bridge, Road
Updated
22 Jul 2026
Source
MSN

ConstructChat

Ask ConstructChat about 13th Street Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “13th Street Bridge Replacement Project” is an infrastructure initiative in the Bridge sector. Taiyo aggregates data on it from MSN.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 13th Street Bridge replacement project is currently on hold and is scheduled to resume in 2028. This project aims to replace the existing bridge to improve safety and traffic flow.

Location

Not available for this record.

Source

Source

MSN

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2025-02-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project