logo
ProjectPre-Design

140 Lockhart Industrial Subdivision Master Report

Sector: Manufacturing (Industrial) • Location: Barrie, Ontario, Canada

Source: Dodge

The draft plan proposes to extend Welham Road from the existing cul-de-sac at the north east corner of the property southward to connect with Lockhart Road. The industrial subdivision will contain 33 industrial lots and 5 blocks, of which Block 1 is proposed for the industrial use for Ram Iron, Block 2 is for Stormwater Management, Block 3 and 4 are for environmental protection and Block 5 for a p

Status
Prospective
Sector
Manufacturing (Industrial), Metal, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Car parking, Steel, Automotive, Warehouse
Location
Barrie, Ontario, Canada
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 140 Lockhart Industrial Subdivision Master Report

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “140 Lockhart Industrial Subdivision Master Report” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Barrie, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The draft plan proposes to extend Welham Road from the existing cul-de-sac at the north east corner of the property southward to connect with Lockhart Road. The industrial subdivision will contain 33 industrial lots and 5 blocks, of which Block 1 is proposed for the industrial use for Ram Iron, Block 2 is for Stormwater Management, Block 3 and 4 are for environmental protection and Block 5 for a proposed road widening along Lockhart Road.

Budget

Location

Country

Canada

State

Ontario

City

Barrie

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Metal, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Car parking, Steel, Automotive, Warehouse

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project