1403 Orange Circle Renovation REBID
Sector: Consumer Products • Location: Florence, South Carolina, United States of America
Source: Dodge USA
renovations to the house located at 1403 Orange Circle. 1. Replace Front door threshold and adjust front door for proper closing. 2. Remove and replace front storm door with a new door. 3. Install handrail on front porch steps. 4. Remove and repair all rotten wood around exterior of windows, caulk, sand and paint around exterior windows, shutters, fascia, soffits, and gable ends. 5. Remove master
- Status
- Closed
- Sector
- Consumer Products, Residential, Government, Commercial, Manufacturing (Industrial)
- Location
- Florence, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 1403 Orange Circle Renovation REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | renovations to the house located at 1403 Orange Circle. 1. Replace Front door threshold and adjust front door for proper closing. 2. Remove and replace front storm door with a new door. 3. Install handrail on front porch steps. 4. Remove and repair all rotten wood around exterior of windows, caulk, sand and paint around exterior windows, shutters, fascia, soffits, and gable ends. 5. Remove master bedroom floor and subfloor and baseboards install inch sheeting for subfloor, linoleum sheeting a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Florence |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Residential, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
