14TH STREET PEDESTRIAN BRIDGE
Sector: Manufacturing (Industrial) • Location: Columbus, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project is a transportation enhancement in Muscogee County. The 14th Street Bridge pedestrian project will connect the riverwalk projects in Georgia and Alabama. The project consist of rehabilitation and stabilization of the bridge. The construction will include structural stabilization improvements and conversion of the bridge into a pedestrian/bike facility. The project will reconstruct
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project is a transportation enhancement in Muscogee County. The 14th Street Bridge pedestrian project will connect the riverwalk projects in Georgia and Alabama. The project consist of rehabilitation and stabilization of the bridge. The construction will include structural stabilization improvements and conversion of the bridge into a pedestrian/bike facility. The project will reconstruct the existing bridge footings and provide scour protection. The exterior of the bridge will be cleaned and patched with like materials. The existing slab, deck, and railings will be reconstructed. The railings will be designed to look as similar as possible to the existing ones. The deck will consist of brick pavers similar to those on the Riverwalk. Interpretive kiosks will be placed along the bridge documenting the historic industrial development of the area along the Riverwalk. The project is 720 feet long. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Manufacturing (Industrial) projects in United States of America
- Beardslee Blvd Widening
- 2019-ADA Curb Ramps
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- LEGALIZE/CONSTRUCT REAR BATHROOM ADDITION 67 SQ.FT.
- TRACT 8304- BUILDING 12- UNIT 1204-PLAN B2E-ALT-4BD/3BA 2025 SQ FT LIVING,472 GARAGE,11 PORCH, 0 DECK
- VERIZON ANTENNA MODIFICATIONS TO EXISTING TOWER MOUNTED AND GROUND MOUNTED EQUIPMENT
