logo
Project

150-Megawatt Burgos Wind Farm Project

Sector: Road • Location: Philippines

Source: Asian Development Bank (ADB)

The Project involves the construction and operation of a 150 MW wind farm project in the province of Ilocos Norte, in the municipality of Burgos. The wind farm will cover an area of approximately 686 hectares across 3 barangays (Saoit, Poblacion and Nagsurot). The Project is developed under the Renewable Energy (RE) Law and therefore entitled to priority connection to the transmission and distribu

Sector
Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Biomass, Raw Materials, Oil and Gas, Power Generation (CCGT), Government, Education, Wind
Location
Philippines
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about 150-Megawatt Burgos Wind Farm Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “150-Megawatt Burgos Wind Farm Project” is an infrastructure initiative in the Road sector, located in Philippines. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Company

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project involves the construction and operation of a 150 MW wind farm project in the province of Ilocos Norte, in the municipality of Burgos. The wind farm will cover an area of approximately 686 hectares across 3 barangays (Saoit, Poblacion and Nagsurot). The Project is developed under the Renewable Energy (RE) Law and therefore entitled to priority connection to the transmission and distribution system, priority purchase and transmission of, and payment for, electricity sold through the Luzon grid. It may be eligible for a fixed tariff under the governments Feed-in-Tariff (FIT) system. The Project will be built in 2 phases. The components of Phase 1 are (i) the installation of 29 wind turbine generators (WTGs) from Vestas with a generation capacity of 87 MW, (ii) the construction of a wind farm substation; and (iii) the construction of an approximately 42 km long transmission line while Phase 2 consist of the installation of an additional 21 WTGs from Vestas with a generation capacity of 63 MW. Construction for both phases have been completed.

Original sector

Energy

Budget

Location

Country

Philippines

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Biomass, Raw Materials, Oil and Gas, Power Generation (CCGT), Government, Education, Wind

Article published date

2025-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project