logo

150-Megawatt Burgos Wind Farm Project

Sector: Road • Location: Philippines

Source: Asian Development Bank (ADB)

Project

The Project involves the construction and operation of a 150 MW wind farm project in the province of Ilocos Norte, in the municipality of Burgos. The wind farm will cover an area of approximately 686 hectares across 3 barangays (Saoit, Poblacion and Nagsurot). The Project is developed under the Renewable Energy (RE) Law and therefore entitled to priority connection to the transmission and distribu

Project Information FAQ

Project Information

4 Q
The project “150-Megawatt Burgos Wind Farm Project” is an infrastructure initiative in the Road sector, located in Philippines. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project involves the construction and operation of a 150 MW wind farm project in the province of Ilocos Norte, in the municipality of Burgos. The wind farm will cover an area of approximately 686 hectares across 3 barangays (Saoit, Poblacion and Nagsurot). The Project is developed under the Renewable Energy (RE) Law and therefore entitled to priority connection to the transmission and distribution system, priority purchase and transmission of, and payment for, electricity sold through the Luzon grid. It may be eligible for a fixed tariff under the governments Feed-in-Tariff (FIT) system. The Project will be built in 2 phases. The components of Phase 1 are (i) the installation of 29 wind turbine generators (WTGs) from Vestas with a generation capacity of 87 MW, (ii) the construction of a wind farm substation; and (iii) the construction of an approximately 42 km long transmission line while Phase 2 consist of the installation of an additional 21 WTGs from Vestas with a generation capacity of 63 MW. Construction for both phases have been completed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data