logo

150-MW Battery Project in Michigan

Sector: Solar • Location: Michigan, USA

Source: Renewables Now

Project
Planned

ESA Solar Energy has been granted approval to install a 150-MW/600-MWh standalone battery energy storage system (BESS) in Michigan. The facility, named Salzburg, will be built in Midland Township and is designed to deliver critical grid services such as peak shaving, load shifting, and energy arbitrage.

Status
Prospective
Sector
Solar, Energy Storage
Location
Michigan, United States of America
Updated
22 Jul 2026
Source
Renewables Now

ConstructChat

Ask ConstructChat about 150-MW Battery Project in Michigan

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “150-MW Battery Project in Michigan” is an infrastructure initiative in the Solar sector, located in Michigan, USA. Taiyo aggregates data on it from Renewables Now.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ESA Solar Energy has been granted approval to install a 150-MW/600-MWh standalone battery energy storage system (BESS) in Michigan. The facility, named Salzburg, will be built in Midland Township and is designed to deliver critical grid services such as peak shaving, load shifting, and energy arbitrage.

Original sector

Energy Storage

Location

Country

United States of America (USA)

State

Michigan

Source

Source

Renewables Now

URL

More Details

Record type

Project

Sector

Solar, Energy Storage

Article published date

2025-01-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project