logo

1,500 Acres Land Leasing in Gujarat for Solar PV Projects

One of 9,007 projects Taiyo tracks in Gujarat.

Source: SolarQuarter

Project
Planned

NLC India Limited has issued a tender for arranging 1,500 acres of land in Gujarat on a leasehold basis for a minimum period of 29 years and 11 months. The land will be used exclusively for developing large-scale grid-connected solar PV power projects. The selected bidder will also conduct topographical surveys, establish site infrastructure, and obtain all necessary statutory approvals and cleara

Status
Prospective
Sector
Power Generation (CCGT), Solar
Location
Gujarat, India
Updated
22 Jul 2026
Source
SolarQuarter

ConstructChat

Ask ConstructChat about 1,500 Acres Land Leasing in Gujarat for Solar PV Projects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “1,500 Acres Land Leasing in Gujarat for Solar PV Projects” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Gujarat, India. Taiyo aggregates data on it from SolarQuarter.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

NLC India Limited has issued a tender for arranging 1,500 acres of land in Gujarat on a leasehold basis for a minimum period of 29 years and 11 months. The land will be used exclusively for developing large-scale grid-connected solar PV power projects. The selected bidder will also conduct topographical surveys, establish site infrastructure, and obtain all necessary statutory approvals and clearances. Each land parcel must be at least 500 acres and located within 50 km of a GETCO pooling substation with 132 KV or above connectivity.

Original sector

Energy

Location

Country

India

State

Gujarat

Source

Source

SolarQuarter

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2026-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project