15101 Paramount Blvd Redevelopment
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Demolition of existing structures - the commercial buildings include a 25,256 sf retail building (Sprouts Market), a 5,248 sf two tenant drive-thru restaurant building (Panera Bread and pending tenant), 2,400 sf drive thru coffee shop (Starbucks)
- Status
- Prospective
- Sector
- Car parking, Commercial, Consumer Products, Automotive, Raw Materials, Residential
- Location
- Paramount, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 15101 Paramount Blvd Redevelopment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolition of existing structures - the commercial buildings include a 25,256 sf retail building (Sprouts Market), a 5,248 sf two tenant drive-thru restaurant building (Panera Bread and pending tenant), 2,400 sf drive thru coffee shop (Starbucks) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Paramount |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Consumer Products, Automotive, Raw Materials, Residential |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
