155-Megawatt Interruptible Electric Load Addition
Sector: Power Transmission • Location: United States
Source: AOL
Otter Tail Power is bringing online a 155-megawatt load consisting of 3 megawatts firm and 152 megawatts nonfirm load. The load is highly interruptible with minimal new investment required, primarily distribution interconnection costs. It is expected to contribute positively to earnings starting in 2026 and helps spread fixed costs across the customer base.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned to go online soon |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Otter Tail Power is bringing online a 155-megawatt load consisting of 3 megawatts firm and 152 megawatts nonfirm load. The load is highly interruptible with minimal new investment required, primarily distribution interconnection costs. It is expected to contribute positively to earnings starting in 2026 and helps spread fixed costs across the customer base. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
