156th Avenue NE Shared Use Path
Closed · Washington · Last reported Aug 2025
Source: Dodge
The scope of the project is to construct a shared use path on the east side of 156th Ave, from the 4300 Block to NE 51st Street. The project will generally remove the existing sidewalk and street tree wells and construct improvements behind the existing curbline, continuing the improvements recently constructed by private development at the intersection of 156th Ave and 40th Street. Typical dimens
- Status
- Closed
- Sector
- Cement, Government, Road, Car parking, Commercial, Automotive
- Location
- Redmond, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 156th Avenue NE Shared Use Path
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of the project is to construct a shared use path on the east side of 156th Ave, from the 4300 Block to NE 51st Street. The project will generally remove the existing sidewalk and street tree wells and construct improvements behind the existing curbline, continuing the improvements recently constructed by private development at the intersection of 156th Ave and 40th Street. Typical dimensions include a 5 planter/landscape buffer and 12 concrete path. Retaining walls are expected to b... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Redmond |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Road, Car parking, Commercial, Automotive |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
