15th Ave NE Bridge Seismic Retrofit
Sector: Water Supply and Storage • Location: Seattle, Washington, United States of America
Source: Dodge USA
Seismic retrofit of bridge substructure components including strengthening of reinforced concrete crossbeams, footings, and columns, and micropile foundations. Water main work including installing line stop and butterfly valve for existing 30 water main
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Seismic retrofit of bridge substructure components including strengthening of reinforced concrete crossbeams, footings, and columns, and micropile foundations. Water main work including installing line stop and butterfly valve for existing 30 water main |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
