164142CND - Beaconsfield Road Southall UB2 5LE - All Other
Approved · England
Source: Planning London Datahub
Application to discharge condition 11 for planning application ref - PP/2016/0190 dated 09.05.2016 for Application to vary condition 17 (preliminary works and remediation) of Outline Planning Application PP/2008/3981 dated 29/10/2010 for demolition of the following properties: 16-32 (all) The Crescent; 137-143 (odd) and 249 Beaconsfield Road; 1-11 (odd) Randolph Road, Remediation of the land and
- Status
- Prospective
- Sector
- Water Supply and Storage, Mass Transit, Education, Rail, Commercial, Hotel, Automotive, Car parking, Residential, Road
- Location
- London, England, United Kingdom
- Updated
- 19 Nov 2026
- Source
- Planning London Datahub
ConstructChat
Ask ConstructChat about 164142CND - Beaconsfield Road Southall UB2 5LE - All Other
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Application to discharge condition 11 for planning application ref - PP/2016/0190 dated 09.05.2016 for Application to vary condition 17 (preliminary works and remediation) of Outline Planning Application PP/2008/3981 dated 29/10/2010 for demolition of the following properties: 16-32 (all) The Crescent; 137-143 (odd) and 249 Beaconsfield Road; 1-11 (odd) Randolph Road, Remediation of the land and redevelopment of the site to provide a mixed use development of up to the following maximum floorspace: (GLA Decision Notice is in the 'Attachments' folder) + 4,700sqm of leisure forming a cinema + 320,000sqm of residential + 14,200sqm for non-food retail + 5,850sqm of food retail + 1,750sqm of Class A3-A5 uses + 9,650sqm of hotel + 3,000 sqm of conference and banqueting +24,450sqm of multi-storey car park + 2,550sqm of health care facilities + 3,450sqm of education facilities + 3,500sqm of office/studio units + 390sqm of sports pavilion + 600sqm of energy centre + associated car and cycle parking, landscaping, public realm, open space and children's playspace Full details are submitted for approval (layout, scale, appearance and landscaping) for the following accesses: + Pump Lane Link Road - New access road from the A312 Hayes Bypass to the site for vehicle, cycle and pedestrian access, including drainage and a flood attenuation pond - Eastern Access - New access road from South Road to the site for vehicle, cycle and pedestrian access, replacing part of The Crescent + Minet Country Park Footbridge - Central pedestrian and cycle access from the site to the Minet Country Park, bridging over the Grand Union Canal and Yeading Brook + Springfield Road Footbridge - Northern pedestrian and cycle access from the site to Minet County Park and Springfield Road, bridging over the Grand Union Canal and Yeading Brook + Widening of South Road over the railway line for the creation of a bus lane +Three vehicle, cycle and pedestrian accesses onto Beaconsfield Road. | Work Type: |
Location
Country | United Kingdom (UK) |
State | England |
City | London |
Source
Source | Planning London Datahub |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Education, Rail, Commercial, Hotel, Automotive, Car parking, Residential, Road |
Article published date | 2026-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
