164th Ave NE Install Channelization and Flashing Crosswalk
Sector: Power Generation (CCGT) • Location: Redmond, Washington, United States of America
Source: Dodge USA
In support of the speed limit reduction from 40 mph to 30 mph, install channelization and an AC powered RRFB crosswalk on the north side of NE 87 St including a southbound advance RRFB.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Road, Government, Commercial
- Location
- Redmond, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 164th Ave NE Install Channelization and Flashing Crosswalk
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In support of the speed limit reduction from 40 mph to 30 mph, install channelization and an AC powered RRFB crosswalk on the north side of NE 87 St including a southbound advance RRFB. |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Redmond |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
