logo
ProjectUnder Construction

165 MWp PV Plant with BESS

Sector: Solar • Location: Bulgaria

Source: See News

Public Power Corporation (PPC) has begun construction of a 165 MWp solar photovoltaic (PV) plant with a co-located battery energy storage system (BESS) in Stara Zagora, Bulgaria. The project aims to generate over 265 GWh of energy annually, enough to power more than 45,000 households, while significantly reducing carbon emissions.

Status
Under Construction
Sector
Solar, Energy Storage, Power Generation (CCGT)
Location
Bulgaria
Updated
22 Jul 2026
Source
See News

ConstructChat

Ask ConstructChat about 165 MWp PV Plant with BESS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “165 MWp PV Plant with BESS” is an infrastructure initiative in the Solar sector, located in Bulgaria. Taiyo aggregates data on it from See News.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Public Power Corporation (PPC) has begun construction of a 165 MWp solar photovoltaic (PV) plant with a co-located battery energy storage system (BESS) in Stara Zagora, Bulgaria. The project aims to generate over 265 GWh of energy annually, enough to power more than 45,000 households, while significantly reducing carbon emissions.

Original sector

Energy

Location

Country

Bulgaria

Source

Source

See News

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Power Generation (CCGT)

Article published date

2025-03-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project