165 MWp PV Plant with BESS
Sector: Solar • Location: Bulgaria
Source: See News
Public Power Corporation (PPC) has begun construction of a 165 MWp solar photovoltaic (PV) plant with a co-located battery energy storage system (BESS) in Stara Zagora, Bulgaria. The project aims to generate over 265 GWh of energy annually, enough to power more than 45,000 households, while significantly reducing carbon emissions.
- Status
- Under Construction
- Sector
- Solar, Energy Storage, Power Generation (CCGT)
- Location
- Bulgaria
- Updated
- 22 Jul 2026
- Source
- See News
ConstructChat
Ask ConstructChat about 165 MWp PV Plant with BESS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Public Power Corporation (PPC) has begun construction of a 165 MWp solar photovoltaic (PV) plant with a co-located battery energy storage system (BESS) in Stara Zagora, Bulgaria. The project aims to generate over 265 GWh of energy annually, enough to power more than 45,000 households, while significantly reducing carbon emissions. |
Original sector | Energy |
Location
Country | Bulgaria |
Source
Source | See News |
URL |
More Details
Record type | Project |
Sector | Solar, Energy Storage, Power Generation (CCGT) |
Article published date | 2025-03-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
