16th Avenue 750,000 Gallon Water Tower Reconditioning
Sector: Water Supply and Storage • Location: Eldridge, Iowa, United States of America
Source: Dodge
Base Bid 1. Cleaning, sandblasting, and painting all interior and exterior surfaces. Full Containment is necessary. 2. Miscellaneous structure modifications and welding and grinding. 3. Substantial Completion with Tower being back in services shall be substantially completed by June 30, 2025. Contractor shall start project and have 13 weeks to return the tower back into service. Alternate Bid 1. C
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Eldridge, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 16th Avenue 750,000 Gallon Water Tower Reconditioning
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Base Bid 1. Cleaning, sandblasting, and painting all interior and exterior surfaces. Full Containment is necessary. 2. Miscellaneous structure modifications and welding and grinding. 3. Substantial Completion with Tower being back in services shall be substantially completed by June 30, 2025. Contractor shall start project and have 13 weeks to return the tower back into service. Alternate Bid 1. Cleaning, sandblasting, and painting all interior and exterior surfaces. Full Containment is neces... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Eldridge |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
