logo
ProjectClosed

171 Ave SE Water Main Replacement Phase 2

Closed · Washington · Last reported Sep 2024

Source: Dodge USA

Installation of approximately 6,150 lineal feet of 8 ductile iron water main and appurtenances to replace existing 6 asbestos cement water main, water main connections, fire hydrants, reconnection of existing water services, trench restoration and limited pavement overlay, and site restoration. Project is located northeast of the City of Snohomish in unincorporated Snohomish County.

Status
Closed
Sector
Road, Metal, Commercial, Waste Processing and Treatment, Water Supply and Storage, Steel
Location
Snohomish, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 171 Ave SE Water Main Replacement Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “171 Ave SE Water Main Replacement Phase 2” is an infrastructure initiative in the Road sector, located in Snohomish, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Installation of approximately 6,150 lineal feet of 8 ductile iron water main and appurtenances to replace existing 6 asbestos cement water main, water main connections, fire hydrants, reconnection of existing water services, trench restoration and limited pavement overlay, and site restoration. Project is located northeast of the City of Snohomish in unincorporated Snohomish County.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Snohomish

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Metal, Commercial, Waste Processing and Treatment, Water Supply and Storage, Steel

Article published date

2024-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project