logo
ProjectClosed

171st Ave Water Main Replacement - Phase 3

Closed · Washington · Last reported Jan 2025

Source: Dodge

Installation of approximately 3,420 lineal feet of 8 ductile iron water main and appurtenances to replace existing 6 asbestos cement water main, water main connections, fire hydrants, reconnection of existing water services, trench restoration and limited pavement overlay, and site restoration. The project includes four separate work segments varying in length, divided based on ability to complete

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Metal, Steel
Location
Snohomish, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 171st Ave Water Main Replacement - Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “171st Ave Water Main Replacement - Phase 3” is an infrastructure initiative in the Water Supply and Storage sector, located in Snohomish, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Installation of approximately 3,420 lineal feet of 8 ductile iron water main and appurtenances to replace existing 6 asbestos cement water main, water main connections, fire hydrants, reconnection of existing water services, trench restoration and limited pavement overlay, and site restoration. The project includes four separate work segments varying in length, divided based on ability to complete work and connections to existing system while minimizing mterruptions of service.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Snohomish

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Metal, Steel

Article published date

2025-01-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project