177 Central Way Mixed Use
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
construct a 4-story mixed use project with approximately 4,000 square feet of ground floor commercial area and 25 to 30 residential units (see Attachment 2). Parking is proposed within an at grade and below-grade structured parking.
- Status
- Prospective
- Sector
- Commercial, Car parking, Manufacturing (Industrial), Residential, Automotive
- Location
- Kirkland, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 177 Central Way Mixed Use
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construct a 4-story mixed use project with approximately 4,000 square feet of ground floor commercial area and 25 to 30 residential units (see Attachment 2). Parking is proposed within an at grade and below-grade structured parking. |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Kirkland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Manufacturing (Industrial), Residential, Automotive |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
