logo

1.8 MW Net-Metered Solar Carport Projects in Delhi

Sector: Power Generation (CCGT) • Location: Delhi, India

Source: Energetica India Magazine

Project
Planned

The Delhi Development Authority has floated a tender to develop 1.8 MW of net-metered solar carport projects under the RESCO model in Delhi. The project includes a 1.5 MW installation at District Park and NG Drain along the outer ring road to Khayala bridge, and a 300 kW project at MP Green Belt, Mangolpuri. The scope includes design, supply, erection, testing, and commissioning of ground-mounted

Status
Prospective
Sector
Power Generation (CCGT), Solar
Location
Delhi, India
Updated
22 Jul 2026
Source
Energetica India Magazine

ConstructChat

Ask ConstructChat about 1.8 MW Net-Metered Solar Carport Projects in Delhi

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “1.8 MW Net-Metered Solar Carport Projects in Delhi” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Delhi, Delhi, India. Taiyo aggregates data on it from Energetica India Magazine.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Delhi Development Authority has floated a tender to develop 1.8 MW of net-metered solar carport projects under the RESCO model in Delhi. The project includes a 1.5 MW installation at District Park and NG Drain along the outer ring road to Khayala bridge, and a 300 kW project at MP Green Belt, Mangolpuri. The scope includes design, supply, erection, testing, and commissioning of ground-mounted solar carport power plants, with a completion timeline of 6 months and 25 years of operation and maintenance.

Original sector

Renewable Energy

Location

Country

India

State

Delhi

City

Delhi

Source

Source

Energetica India Magazine

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2026-07-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project