18 Street Ditch Improvements
Sector: Water Supply and Storage • Location: Abraham Baldwin College, Georgia, United States of America
Source: Dodge
Work to Be Done: The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed 18th Street Ditch Improvements as shown on the construction drawings. In general, construction consists of the removal of four bridge driveway structures over the south side ditch and their replacement with four double 8ft x 8ft concrete box culverts. The project
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial, Car parking, Bridge, Automotive, Road
- Location
- Abraham Baldwin College, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 18 Street Ditch Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work to Be Done: The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed 18th Street Ditch Improvements as shown on the construction drawings. In general, construction consists of the removal of four bridge driveway structures over the south side ditch and their replacement with four double 8ft x 8ft concrete box culverts. The project also includes the installation of a concrete side barrier, curb and gutter, and guardrail as well... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Abraham Baldwin College |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial, Car parking, Bridge, Automotive, Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
