183179CND - High Lane London W7 3RT - All Other
One of 10,000+ projects Taiyo tracks in England.
Source: Planning London Datahub
Details of energy efficiency pursuant to condition 16 of ref: 173749VAR granted on 23.10.2017 for the 'Application for a Minor Material Amendment (s.73) to vary conditions 4 (Removal of Temporary Nursery Accommodation) and condition 21 (Flood Risk Mitigation) of application 161902FULR3 dated 02/12/2016 for 'Redevelopment consisting of the construction of a part single-storey, part two-storey and p
- Status
- Prospective
- Sector
- Commercial, Road
- Location
- London, England, United Kingdom
- Updated
- 19 Nov 2026
- Source
- Planning London Datahub
ConstructChat
Ask ConstructChat about 183179CND - High Lane London W7 3RT - All Other
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Details of energy efficiency pursuant to condition 16 of ref: 173749VAR granted on 23.10.2017 for the 'Application for a Minor Material Amendment (s.73) to vary conditions 4 (Removal of Temporary Nursery Accommodation) and condition 21 (Flood Risk Mitigation) of application 161902FULR3 dated 02/12/2016 for 'Redevelopment consisting of the construction of a part single-storey, part two-storey and part three storey school building (following the demolition of the existing part single-storey and part two-storey school) with access ramp and steps, associated hardstanding and landscaping and installation of cycle storage units; Relocation of temporary (one year) single storey nursery building - Regulation 3 Council's own development (Departure Application)'. Variation seeking to amend date of condition 4 (Removal of Temporary Nursery Accommodation) until 31.10.2018 and to amend the date of condition 21 (Flood Risk Mitigation Measures) to "within three months of the demolition of the existing school building' | Work Type: |
Location
Country | United Kingdom (UK) |
State | England |
City | London |
Source
Source | Planning London Datahub |
URL |
More Details
Record type | Project |
Sector | Commercial, Road |
Article published date | 2026-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United Kingdom
- Brigg Biomass Power Plant North Lincolnshire
- Coryton Refinery
- Gas to the West Project
- River Humber Gas Pipeline Replacement Project, North Lincolnshire
- Horse Hill Oil Field, Surrey
- A556 Knutsford-Bowdon Improvement Project
- Rose Whittle Delta Bloc Barrier System, United Kingdom
- Costa Coffee Roastery, Basildon, Essex, UK
