183A Toll Road, Texas
Sector: Bridge • Location: Texas, United States of America
Source: Ferrovial
Ferrovial Business Lines Projects 183A Toll Road, Texas Williamson county, texas $77M Cost 300000sq. yd. Of concrete paving 2 Pedestrian bridges Phase II of the 183A Turnpike Project is located in southwestern Williamson County and extends approximately 5.1 miles. Phase II of the 183A Turnpike Project is located in southwestern Williamson County and extends approximately 5.1 miles, traversing th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Ferrovial Business Lines Projects 183A Toll Road, Texas Williamson county, texas $77M Cost 300000sq. yd. Of concrete paving 2 Pedestrian bridges Phase II of the 183A Turnpike Project is located in southwestern Williamson County and extends approximately 5.1 miles. Phase II of the 183A Turnpike Project is located in southwestern Williamson County and extends approximately 5.1 miles, traversing through the cities of Cedar Park and Leander in the State of Texas. The project extended the main lanes of the existing 183A Turnpike from FM 1431 to north of RM 2243. This limited-access toll road was constructed between the existing frontage roads – which were constructed as part of the initial phase of the project – and the added capacity consisted of three lanes in each direction with access ramps connecting to the frontage roads. It is located east of, and parallel to, the existing US 183 facility. The construction tasks principally included: preparation of right-of-way; excavation and embankment; flexible base / cement treated base; warm mix asphalt; concrete pavement;concrete curb and gutter; roadway bridges; retaining walls; drill shafts; rip rap; concrete box culverts and other drainage structures; water quality ponds; barricades, signs, and traffic handling; illumination; overhead sign supports; traffic / pedestrian signal head, pole, and detectors; a pedestrian bridge; toll facilities; and ITS ducts. The project consisted of over 300,000 sq. yd. of concrete paving. It had over 33 MSE walls built, and 14 bridges. There is a 4 mile sidewalk on the job with 2 pedestrian bridges as well. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
