logo
ProjectApprovedBP

184341CND - Warple Way London W3 0RG - All Other

Sector: Waste Processing and Treatment • Location: Ealing, London, England, United Kingdom

Source: Planning London Datahub

Application for the partial discharge of requirement ACTST 7 of Schedule 3 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order (SI:2014/2384) as amended by the Thames Water Utilities Limited (Thames Tideway Tunnel) (Correction) Order (SI:2015/723) and the Notice of Variation No 1 to the Deemed Marine Licence, for alterations to the pedestrian access at the south of the ACTST site t

Status
Prospective
Sector
Waste Processing and Treatment, Water Supply and Storage, Tunnel
Location
London, England, United Kingdom
Updated
19 Nov 2026
Source
Planning London Datahub

ConstructChat

Ask ConstructChat about 184341CND - Warple Way London W3 0RG - All Other

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “184341CND - Warple Way London W3 0RG - All Other” is an infrastructure initiative in the Waste Processing and Treatment sector, located in London, England, United Kingdom. Taiyo aggregates data on it from Planning London Datahub.

Participants

Not available for this record.

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Application for the partial discharge of requirement ACTST 7 of Schedule 3 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order (SI:2014/2384) as amended by the Thames Water Utilities Limited (Thames Tideway Tunnel) (Correction) Order (SI:2015/723) and the Notice of Variation No 1 to the Deemed Marine Licence, for alterations to the pedestrian access at the south of the ACTST site to be used during construction only. | Work Type:

Location

Country

United Kingdom (UK)

State

England

City

London

Source

Source

Planning London Datahub

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Tunnel

Article published date

2026-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project