logo

187.5 MW / 750 MWh Battery Energy Storage System (BESS) Project

Sector: Manufacturing (Industrial) • Location: Choutuppal, Telangana, India

Source: Whalesbook

Project
Awarded

Ahasolar Technologies has been appointed as the Owner's Engineer-cum-Engineering Consultancy Firm by Coal India Limited to provide pre-award and post-award engineering consultancy services for a 187.5 MW / 750 MWh Battery Energy Storage System (BESS) project located at a 400/220 kV sub-station in Choutuppal, Telangana. The consultancy contract spans 15 months and focuses on technical oversight and

Status
Closed
Sector
Manufacturing (Industrial), Energy Storage
Location
Choutuppal, Telangana, India
Updated
22 Jul 2026
Source
Whalesbook

ConstructChat

Ask ConstructChat about 187.5 MW / 750 MWh Battery Energy Storage System (BESS) Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “187.5 MW / 750 MWh Battery Energy Storage System (BESS) Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Choutuppal, Telangana, India. Taiyo aggregates data on it from Whalesbook.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ahasolar Technologies has been appointed as the Owner's Engineer-cum-Engineering Consultancy Firm by Coal India Limited to provide pre-award and post-award engineering consultancy services for a 187.5 MW / 750 MWh Battery Energy Storage System (BESS) project located at a 400/220 kV sub-station in Choutuppal, Telangana. The consultancy contract spans 15 months and focuses on technical oversight and engineering consultancy for the EPC project.

Original sector

Energy

Budget

Location

Country

India

State

Telangana

City

Choutuppal

Source

Source

Whalesbook

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Energy Storage

Article published date

2026-07-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project