logo

187.5 MW/750 MWh Battery Energy Storage System (BESS) Project at 400/220 kV Sub-Station

The owner, status and timeline of this project. A free account opens every field.

Source: Scanx

Project
Awarded

Ahasolar Technologies secured a consultancy contract from Coal India Limited to provide engineering consultancy services for a 187.5 MW/750 MWh Battery Energy Storage System (BESS) project at the 400/220 kV Sub-Station in Choutuppal, Telangana. The contract includes pre-award and post-award engineering services for the EPC of the project, with Ahasolar acting as the Owner's Engineer-cum-Engineerin

Status
Closed
Sector
Energy Storage
Location
Choutuppal, Telangana, India
Updated
22 Jul 2026
Source
Scanx

ConstructChat

Ask ConstructChat about 187.5 MW/750 MWh Battery Energy Storage System (BESS) Project at 400/220 kV Sub-Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “187.5 MW/750 MWh Battery Energy Storage System (BESS) Project at 400/220 kV Sub-Station” is an infrastructure initiative in the Energy Storage sector, located in Choutuppal, Telangana, India. Taiyo aggregates data on it from Scanx.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ahasolar Technologies secured a consultancy contract from Coal India Limited to provide engineering consultancy services for a 187.5 MW/750 MWh Battery Energy Storage System (BESS) project at the 400/220 kV Sub-Station in Choutuppal, Telangana. The contract includes pre-award and post-award engineering services for the EPC of the project, with Ahasolar acting as the Owner's Engineer-cum-Engineering Consultancy Firm.

Original sector

Energy

Budget

Location

Country

India

State

Telangana

City

Choutuppal

Source

Source

Scanx

URL

More Details

Record type

Project

Sector

Energy Storage

Article published date

2026-07-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project