18th Avenue Resurfacing
Sector: Power Transmission • Location: California, United States of America
Source: Riverside County
Limits: 600 feet west of Langlois Road to 300 feet east of Langlois Road Length: Approximately 950 feet District: 4 Community: Desert Edge
The County of Riverside Transportation Department is proposing to resurface approximately 950 feet of 18th Avenue from 600 feet west of Langlois Road to 300 feet east of Langlois Road. 18th Avenue is classified as a Secondary Highway in the County of Riverside
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: 600 feet west of Langlois Road to 300 feet east of Langlois Road Length: Approximately 950 feet District: 4 Community: Desert Edge The County of Riverside Transportation Department is proposing to resurface approximately 950 feet of 18th Avenue from 600 feet west of Langlois Road to 300 feet east of Langlois Road. 18th Avenue is classified as a Secondary Highway in the County of Riversides General Plan. 18th Avenue is 32 feet wide with curb/gutter along various segments of the roadway. The proposed project will include removing the roadway and placing back Hot Mix Asphalt (HMA). The proposed project will also include: Placement of safety edge and shoulder backing Utility adjustments Salvage/removal and installation of new signs No additional right-of-way will be required to construct the proposed improvements. The project improvements will remain within the existing footprint of the roadway. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Transmission projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
- LOT-12 MAIN HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
- LOT-7 HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC. UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- LOT-4 MAIN HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC. UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
