18th St. NW Reconstruction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
engineering design services primarily for the reconstruction of the 18th St. NW Reconstruction GP 1353 brick street between Cleveland Ave. NW and Market Ave NW. The proposed project will consist of: Removing the existing bricks, base and curbing, and replacing with new brick, base and curbing Replacing the existing 6 and 8 cast iron water mains, and appurtenances Replacing existing 8 sanitary sewe
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Steel, Government, Commercial
- Location
- Canton, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 18th St. NW Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | engineering design services primarily for the reconstruction of the 18th St. NW Reconstruction GP 1353 brick street between Cleveland Ave. NW and Market Ave NW. The proposed project will consist of: Removing the existing bricks, base and curbing, and replacing with new brick, base and curbing Replacing the existing 6 and 8 cast iron water mains, and appurtenances Replacing existing 8 sanitary sewers, and appurtenances Adjusting storm sewer structures as necessary Sidewalks may be included eng... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Canton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Steel, Government, Commercial |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
