19 Road Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project consists of utility, pedestrian and roadway improvements on 19 Rd. between Highway 6 & 50 and J.2 Rd. in the City of Fruita. Work includes, but is not limited to, traffic control, the modification of existing and installation of 1,250 of new domestic water line and fittings, 4,200 of sanitary sewer line, 5,000 of storm drain line, 2,500 of irrigation line, inlets, manholes and diversi
- Status
- Closed
- Sector
- Car parking, Power Transmission, Commercial, Road, Water Supply and Storage, Waste Processing and Treatment, Automotive, Government, Power Generation (CCGT)
- Location
- Fruita, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 19 Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of utility, pedestrian and roadway improvements on 19 Rd. between Highway 6 & 50 and J.2 Rd. in the City of Fruita. Work includes, but is not limited to, traffic control, the modification of existing and installation of 1,250 of new domestic water line and fittings, 4,200 of sanitary sewer line, 5,000 of storm drain line, 2,500 of irrigation line, inlets, manholes and diversion boxes, removal of an existing canal box culvert, installation of 150 of new cast-in-place cana... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Fruita |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Commercial, Road, Water Supply and Storage, Waste Processing and Treatment, Automotive, Government, Power Generation (CCGT) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
