logo
ProjectClosed

19 Road Improvements

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

This project consists of utility, pedestrian and roadway improvements on 19 Rd. between Highway 6 & 50 and J.2 Rd. in the City of Fruita. Work includes, but is not limited to, traffic control, the modification of existing and installation of 1,250 of new domestic water line and fittings, 4,200 of sanitary sewer line, 5,000 of storm drain line, 2,500 of irrigation line, inlets, manholes and diversi

Status
Closed
Sector
Car parking, Power Transmission, Commercial, Road, Water Supply and Storage, Waste Processing and Treatment, Automotive, Government, Power Generation (CCGT)
Location
Fruita, Colorado, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 19 Road Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “19 Road Improvements” is an infrastructure initiative in the Car parking sector, located in Fruita, Colorado, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of utility, pedestrian and roadway improvements on 19 Rd. between Highway 6 & 50 and J.2 Rd. in the City of Fruita. Work includes, but is not limited to, traffic control, the modification of existing and installation of 1,250 of new domestic water line and fittings, 4,200 of sanitary sewer line, 5,000 of storm drain line, 2,500 of irrigation line, inlets, manholes and diversion boxes, removal of an existing canal box culvert, installation of 150 of new cast-in-place cana...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Fruita

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Car parking, Power Transmission, Commercial, Road, Water Supply and Storage, Waste Processing and Treatment, Automotive, Government, Power Generation (CCGT)

Article published date

2024-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project