190 MLD Water Treatment Plant at Aluva
Planned · Kerala · Last reported Mar 2026
Source: The Times of India
A proposed water treatment plant with a capacity of 190 million litres per day (MLD) at Aluva included as part of the ADB project to improve water generation in Ernakulam. The detailed proposal has been submitted to the government but is yet to be approved by the state cabinet.
- Status
- Prospective
- Sector
- Government, Water Supply and Storage
- Location
- Ernakulam, Kerala, India
- Updated
- 22 Jul 2026
- Source
- The Times of India
ConstructChat
Ask ConstructChat about 190 MLD Water Treatment Plant at Aluva
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposed water treatment plant with a capacity of 190 million litres per day (MLD) at Aluva included as part of the ADB project to improve water generation in Ernakulam. The detailed proposal has been submitted to the government but is yet to be approved by the state cabinet. |
Original sector | Water Supply |
Location
Country | India |
State | Kerala |
City | Ernakulam |
Source
Source | The Times of India |
URL |
More Details
Record type | Project |
Sector | Government, Water Supply and Storage |
Article published date | 2026-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
