191282 - Phase 3 , Oldtown Mill , Celbridge
The status, timeline and source of this project. A free account opens every field.
the construction of 75 no. residential dwellings consisting of 51no. two storey houses; 12 no. 2 bed own door duplex units contained in a three-storey block (Block 1) and 12 no. own door/duplex apartment units (6 no. 2 bed duplex units and 6 no. 1 bed apartment units) contained in a two storey block (Block 2). The proposed house units are comprised of 5 no. 4 bed, end of terrace units (Type A2); 1
- Status
- Prospective
- Sector
- Automotive, Residential, Road
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 191282 - Phase 3 , Oldtown Mill , Celbridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | application finalised |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | the construction of 75 no. residential dwellings consisting of 51no. two storey houses; 12 no. 2 bed own door duplex units contained in a three-storey block (Block 1) and 12 no. own door/duplex apartment units (6 no. 2 bed duplex units and 6 no. 1 bed apartment units) contained in a two storey block (Block 2). The proposed house units are comprised of 5 no. 4 bed, end of terrace units (Type A2); 17 no. 3 bed, semi-detached and end of terrace units (Type B1); 21 no. 3 bed, mid-terrace units (Types B2 and B5) and 8 no. 3 bed, end of terrace units (Type B4 and B4.1). The proposed development also includes the creation of a vehicular and pedestrian access from the Oldtown Mill Road with associated works; together with ancillary exterior bin and bike storage for the duplex/apartment blocks; public open space; internal roads; car parking; infrastructure; boundary treatments and all associated site and development works on a site measuring approx. 2.2ha. Revised by significant further information consisting of; (a) revision of the red line boundary of the site and an increase in the overall site area (increase from approx. 2.2 ha to approx. 2.3 ha) to accommodate the removal of a portion of a hedgerow along the southern boundary of the site; (b) revision of the proposed unit mix due to the replacement of 2 no. three-bedroom houses (reduction from 46 to 44 no. 3 bed units) with 2 no. four-bedroom houses (increase from 5 to 7 no. 4 bed units); (c) together with associated and ancillary revisions to the site layout and levels, boundary treatment, landscaping, internal storage within the proposed house units, bin storage provision, parking provision, drainage and services infrastructure and all associated site and development works |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Sector | Automotive, Residential, Road |
Article published date | 2026-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in Ireland
- Limerick Tunnel and Ring Road, Republic of Ireland
- N25 New Ross Bypass
- Pfizer’s Biotechnology Campus, Clondalkin, Ireland
- Janssen Sciences’ Biomedicines Manufacturing Facility, Ringaskiddy, Ireland
- Jazz Pharmaceuticals Development and Manufacturing Facility, Athlone
- ILC Dover Manufacturing Facility
- SMART Access Controlled Secure Bike Lockers
- Takeda Bulk API Plant
