logo
ProjectClosed

1975 Stuart St Tank Replacement

One of 10,000+ projects Taiyo tracks in California.

Source: Dodge

The work involves replacement of two (2) bolted steel water storage tanks with two (2) new welded steel storage tanks. The 212,000 gallon tank has a diameter of 39 feet and a height of 26 feet. The 125,000 gallon tank has a diameter of 30 feet and a height of 26 feet. The work also includes site improvements including grading, site drainage, modification of existing retaining wall, and replacement

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Steel, Commercial, Government, Metal
Location
Cambria, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 1975 Stuart St Tank Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “1975 Stuart St Tank Replacement” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Cambria, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work involves replacement of two (2) bolted steel water storage tanks with two (2) new welded steel storage tanks. The 212,000 gallon tank has a diameter of 39 feet and a height of 26 feet. The 125,000 gallon tank has a diameter of 30 feet and a height of 26 feet. The work also includes site improvements including grading, site drainage, modification of existing retaining wall, and replacement of fencing. See Exhibit D (Technical Specifications) for the complete outline of the project wor...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Cambria

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Steel, Commercial, Government, Metal

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project