1977 Saturn Data Center
Sector: Power Generation (CCGT) • Location: Monterey Park, California, United States of America
Source: Dodge
construct a new 218,400-square-foot data center with an ancillary equipment yard, substation, parking, and landscaping. The proposed data center building would be one story and 36 feet in height (46.5 feet to top of mechanical equipment platform screening). An approximately 75,000-square-foot ancillary equipment yard would be located adjacent to the north side of the data center. The Project would
- Status
- Failure
- Sector
- Power Generation (CCGT), Data Center, Commercial, Car parking, Automotive
- Location
- Monterey Park, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 1977 Saturn Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | abandoned |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construct a new 218,400-square-foot data center with an ancillary equipment yard, substation, parking, and landscaping. The proposed data center building would be one story and 36 feet in height (46.5 feet to top of mechanical equipment platform screening). An approximately 75,000-square-foot ancillary equipment yard would be located adjacent to the north side of the data center. The Project would include several back-up diesel generators to provide power in the event of an emergency. The Pro... |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Monterey Park |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Data Center, Commercial, Car parking, Automotive |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
