198 MW Group Captive Wind Project in Karur, Tamil Nadu
Sector: Power Generation (CCGT) • Location: Karur, Tamil Nadu, India
Source: Orfonline
A 198 MW wind energy project commissioned for Tata Steel under the group captive model, comprising 55 wind turbine generators each with 3.6 MW capacity, generating around 31 million units annually and offsetting about 26,350 tonnes of CO2 emissions per year.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Wind, Steel
- Location
- Karur, Tamil Nadu, India
- Updated
- 22 Jul 2026
- Source
- Orfonline
ConstructChat
Ask ConstructChat about 198 MW Group Captive Wind Project in Karur, Tamil Nadu
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | commissioned |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 198 MW wind energy project commissioned for Tata Steel under the group captive model, comprising 55 wind turbine generators each with 3.6 MW capacity, generating around 31 million units annually and offsetting about 26,350 tonnes of CO2 emissions per year. |
Original sector | Energy |
Location
Country | India |
State | Tamil Nadu |
City | Karur |
Source
Source | Orfonline |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Steel |
Article published date | 2026-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
