logo

199 MW / 800 MWh Firm and Dispatchable Renewable Energy (FDRE) Project

Sector: Solar • Location: India

Source: SolarQuarter

Project
Awarded

AMPIN Energy Transition has signed a power purchase agreement (PPA) for its 199 MW / approximately 800 MWh Firm and Dispatchable Renewable Energy (FDRE) project under Solar Energy Corporation of India Limited (SECI) Tranche VII. The project integrates renewable energy generation with battery energy storage to provide reliable and dispatchable clean power under a long-term contractual framework, su

Status
Closed
Sector
Solar, Energy Storage, Power Generation (CCGT)
Location
India
Updated
22 Jul 2026
Source
SolarQuarter

ConstructChat

Ask ConstructChat about 199 MW / 800 MWh Firm and Dispatchable Renewable Energy (FDRE) Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “199 MW / 800 MWh Firm and Dispatchable Renewable Energy (FDRE) Project” is an infrastructure initiative in the Solar sector, located in India. Taiyo aggregates data on it from SolarQuarter.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

AMPIN Energy Transition has signed a power purchase agreement (PPA) for its 199 MW / approximately 800 MWh Firm and Dispatchable Renewable Energy (FDRE) project under Solar Energy Corporation of India Limited (SECI) Tranche VII. The project integrates renewable energy generation with battery energy storage to provide reliable and dispatchable clean power under a long-term contractual framework, supplying renewable electricity during non-solar hours to support grid stability and round-the-clock clean energy demand in India.

Original sector

Energy

Location

Country

India

Source

Source

SolarQuarter

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Power Generation (CCGT)

Article published date

2026-07-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project