19th Hole Grill Kitchen Improvements
Closed · California · Last reported Sep 2025
Source: Dodge
Tenant Improvement Kitchen Remodel and new plumbing fixture install. Consisting of demo kitchen and storage walls, install pad blocking in floor at new Kitchen equipment locations, install seamless vinyl flooring, Plumbing including Installing grease interceptor, Electrical including upgrade service to 400-amp, Plumbing, HVAC, Drywall, Paint, FRP, Sheet metal, Hood ventilation, Handicap accessible
- Status
- Closed
- Sector
- Metal, Consumer Products, Power Generation (CCGT), Car parking, Automotive, Rail, Commercial, Raw Materials, Seaport, Government
- Location
- Needles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 19th Hole Grill Kitchen Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tenant Improvement Kitchen Remodel and new plumbing fixture install. Consisting of demo kitchen and storage walls, install pad blocking in floor at new Kitchen equipment locations, install seamless vinyl flooring, Plumbing including Installing grease interceptor, Electrical including upgrade service to 400-amp, Plumbing, HVAC, Drywall, Paint, FRP, Sheet metal, Hood ventilation, Handicap accessible, Parking and stripping, stair rails and ramps. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Needles |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Consumer Products, Power Generation (CCGT), Car parking, Automotive, Rail, Commercial, Raw Materials, Seaport, Government |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
