1st Floor Security Additional Interview Room Renovation
Sector: Metal • Location: Columbia, South Carolina, United States of America
Source: Dodge
Scope of Work: a. The Contractor shall purchase and install 1 new handicap accessible, wooden fire rated doors, metal frames, and new commercial door hardware (Dexter C2000 Cylindrical, Entry/Office or comparable) with keys on new doors per the attached space plan. (Attachment A: New Construction) b. The Contractor shall install door stops to prevent damage to the new doors. c. The Contractor shal
- Status
- Closed
- Sector
- Metal, Government, Road, Residential, Manufacturing (Industrial), Commercial
- Location
- Columbia, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 1st Floor Security Additional Interview Room Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work: a. The Contractor shall purchase and install 1 new handicap accessible, wooden fire rated doors, metal frames, and new commercial door hardware (Dexter C2000 Cylindrical, Entry/Office or comparable) with keys on new doors per the attached space plan. (Attachment A: New Construction) b. The Contractor shall install door stops to prevent damage to the new doors. c. The Contractor shall add a frame to the view light on the door entering the space. d. The Contractor shall add a wal... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Columbia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Government, Road, Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
