2 GW Encapsulation Polyolefin Elastomer Film Manufacturing Facility
Sector: Solar • Location: Ambala, Haryana, India
Source: Mercomindia.com
Saatvik Green Energy operationalized a 2 GW encapsulation polyolefin elastomer (EPE) film manufacturing facility at its campus in Ambala, Haryana. The facility produces films that ensure strong adhesion between solar cell layers for electrical insulation and durability.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Ambala, Haryana, India
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about 2 GW Encapsulation Polyolefin Elastomer Film Manufacturing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Saatvik Green Energy operationalized a 2 GW encapsulation polyolefin elastomer (EPE) film manufacturing facility at its campus in Ambala, Haryana. The facility produces films that ensure strong adhesion between solar cell layers for electrical insulation and durability. |
Original sector | Solar Manufacturing |
Location
Country | India |
State | Haryana |
City | Ambala |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2025-12-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
