logo

20 MW Palinpinon II Geothermal Optimization Project

Sector: Water Supply and Storage • Location: Philippines

Source: World Bank

Project
Closed

The objective of the Nasulo Geothermal Power Project for Philippines is to help mitigate global climate change by facilitating the use of market-based mechanisms sanctioned under the Kyoto protocol through support to clean energy projects in the Philippines. The project components include: the project is located in the Second Palinpinon geothermal production fields in the Southern part of Negros I

Project Information FAQ

Project Information

5 Q
The project “20 MW Palinpinon II Geothermal Optimization Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Philippines. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Nasulo Geothermal Power Project for Philippines is to help mitigate global climate change by facilitating the use of market-based mechanisms sanctioned under the Kyoto protocol through support to clean energy projects in the Philippines. The project components include: the project is located in the Second Palinpinon geothermal production fields in the Southern part of Negros Island, central Philippines. The Second Palinpinon field already supports existing power plants (totaling 80 MW) owned and operated by the National Power Corporation (NPC). The project will 'optimize' reservoir utilization within Second Palinpinon by tapping excess steam for additional power generation capacity amounting to 20 MW. The new power plant, to be owned and operated by Philippine National Oil Corporation-Energy Development Corporation (PNOC-EDC), will contribute to meeting the growth in energy demand in the Visayas grid over the medium and longer term. The project comprises: (1) development of a 20 MW geothermal field, including the drilling of 1 production well, and re-injection wells, as well as the construction of the corresponding fluid collection and re-injection system (FCRS); (2) construction, installation and commissioning of a 1 x 20 geothermal power plant with H2S gas abatement facility; and (3) construction of a switching station in Nasuji to connect to NPC's 138 kV transmission line. Once the power plant is operational, power sales are estimated at about 150 GWh annually.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data