logo
ProjectClosed

20 MW Palinpinon II Geothermal Optimization Project

Sector: Water Supply and Storage • Location: Philippines

Source: World Bank

The objective of the Nasulo Geothermal Power Project for Philippines is to help mitigate global climate change by facilitating the use of market-based mechanisms sanctioned under the Kyoto protocol through support to clean energy projects in the Philippines. The project components include: the project is located in the Second Palinpinon geothermal production fields in the Southern part of Negros I

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Geothermal, Government
Location
Philippines
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about 20 MW Palinpinon II Geothermal Optimization Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “20 MW Palinpinon II Geothermal Optimization Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Philippines. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Nasulo Geothermal Power Project for Philippines is to help mitigate global climate change by facilitating the use of market-based mechanisms sanctioned under the Kyoto protocol through support to clean energy projects in the Philippines. The project components include: the project is located in the Second Palinpinon geothermal production fields in the Southern part of Negros Island, central Philippines. The Second Palinpinon field already supports existing power plants (totaling 80 MW) owned and operated by the National Power Corporation (NPC). The project will 'optimize' reservoir utilization within Second Palinpinon by tapping excess steam for additional power generation capacity amounting to 20 MW. The new power plant, to be owned and operated by Philippine National Oil Corporation-Energy Development Corporation (PNOC-EDC), will contribute to meeting the growth in energy demand in the Visayas grid over the medium and longer term. The project comprises: (1) development of a 20 MW geothermal field, including the drilling of 1 production well, and re-injection wells, as well as the construction of the corresponding fluid collection and re-injection system (FCRS); (2) construction, installation and commissioning of a 1 x 20 geothermal power plant with H2S gas abatement facility; and (3) construction of a switching station in Nasuji to connect to NPC's 138 kV transmission line. Once the power plant is operational, power sales are estimated at about 150 GWh annually.

Original sector

Energy and Extractives

Budget

Location

Country

Philippines

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Geothermal, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project