20 MW Palinpinon II Geothermal Optimization Project
Closed · Philippines
Source: World Bank Group
The objective of the Nasulo Geothermal Power Project for Philippines is to help mitigate global climate change by facilitating the use of market-based mechanisms sanctioned under the Kyoto protocol through support to clean energy projects in the Philippines. The project components include: the project is located in the Second Palinpinon geothermal production fields in the Southern part of Negros I
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Geothermal, Government
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about 20 MW Palinpinon II Geothermal Optimization Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Nasulo Geothermal Power Project for Philippines is to help mitigate global climate change by facilitating the use of market-based mechanisms sanctioned under the Kyoto protocol through support to clean energy projects in the Philippines. The project components include: the project is located in the Second Palinpinon geothermal production fields in the Southern part of Negros Island, central Philippines. The Second Palinpinon field already supports existing power plants (totaling 80 MW) owned and operated by the National Power Corporation (NPC). The project will 'optimize' reservoir utilization within Second Palinpinon by tapping excess steam for additional power generation capacity amounting to 20 MW. The new power plant, to be owned and operated by Philippine National Oil Corporation-Energy Development Corporation (PNOC-EDC), will contribute to meeting the growth in energy demand in the Visayas grid over the medium and longer term. The project comprises: (1) development of a 20 MW geothermal field, including the drilling of 1 production well, and re-injection wells, as well as the construction of the corresponding fluid collection and re-injection system (FCRS); (2) construction, installation and commissioning of a 1 x 20 geothermal power plant with H2S gas abatement facility; and (3) construction of a switching station in Nasuji to connect to NPC's 138 kV transmission line. Once the power plant is operational, power sales are estimated at about 150 GWh annually. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Philippines |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
