20 MW Solar Power Project by Asian Fab Tech
Sector: Solar • Location: Karnataka, India
Source: Mercomindia.com
Asian Fab Tech's 20 MW solar power project in Chamarajanagar faced a delay of 849 days, which was condoned by the Karnataka Electricity Regulatory Commission. The project is now set to proceed with the agreed tariff for energy supplied.
- Status
- Under Construction
- Sector
- Solar, Power Generation (CCGT)
- Location
- Karnataka, India
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about 20 MW Solar Power Project by Asian Fab Tech
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Asian Fab Tech's 20 MW solar power project in Chamarajanagar faced a delay of 849 days, which was condoned by the Karnataka Electricity Regulatory Commission. The project is now set to proceed with the agreed tariff for energy supplied. |
Original sector | Renewable Energy |
Location
Country | India |
State | Karnataka |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
