200 MW grid connected wind power PPP project in India
The status, timeline and source of this project. A free account opens every field.
Source: InfraPPPWorld
The project involves the procurement of 200 MW of wind power on a long-term basis for a maximum period of up to 12 years or the balance useful life of the wind turbine generator from the date of execution of the PPA or the date of expiry of the energy purchase agreement (EPA) for existing wind power projects. The minimum capacity of the wind power project has been set as 0.225 MW and above at one
- Status
- Under Construction
- Sector
- Residential, Power Generation (CCGT), Commercial, Wind, Road
- Location
- India
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about 200 MW grid connected wind power PPP project in India
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in tender |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the procurement of 200 MW of wind power on a long-term basis for a maximum period of up to 12 years or the balance useful life of the wind turbine generator from the date of execution of the PPA or the date of expiry of the energy purchase agreement (EPA) for existing wind power projects. The minimum capacity of the wind power project has been set as 0.225 MW and above at one site with a minimum bid capacity of 0.225 MW. The wind power generator will be allowed to repower the project as per its requirement for a maximum cumulative period of six months during the entire PPA term of up to 12 years. Type-certified wind turbine models will be allowed in case of wind turbine conversions. |
Original sector | Energy |
Procurement method |
Location
Country | India |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Residential, Power Generation (CCGT), Commercial, Wind, Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Construction of the Aga Hall Estate, a high-rise residential project (2 towers of 45 and 56 stories) in Mumbai (India)
- SEI Surya Lab Private Limited
- Salasar Highways Private Limited
- First Solar Telangana Power Plant
- Vijayawada Machiliapatnam Expressways Limited
- SB Energy Solar plant 350-MW
