logo

200 MWdc Solar Farm plus 50MW BESS

Sector: Power Generation (CCGT) • Location: Queensland, Australia

Source: GlobeNewswire

Project

A solar plus Battery Energy Storage System (BESS) project located in Queensland, Australia. Once completed, it will generate clean and sustainable energy exceeding 400 GWh annually, enough to power approximately 72,500 households and reduce CO2 emissions by about 260,000 metric tons per year.

Sector
Power Generation (CCGT), Energy Storage, Solar, Raw Materials
Location
Queensland, Australia
Updated
22 Jul 2026
Source
GlobeNewswire

ConstructChat

Ask ConstructChat about 200 MWdc Solar Farm plus 50MW BESS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

2 Q
The project “200 MWdc Solar Farm plus 50MW BESS” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Queensland, Australia. Taiyo aggregates data on it from GlobeNewswire.

Participants

Not available for this record.

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A solar plus Battery Energy Storage System (BESS) project located in Queensland, Australia. Once completed, it will generate clean and sustainable energy exceeding 400 GWh annually, enough to power approximately 72,500 households and reduce CO2 emissions by about 260,000 metric tons per year.

Original sector

Energy

Location

Country

Australia

State

Queensland

Source

Source

GlobeNewswire

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Energy Storage, Solar, Raw Materials

Article published date

2026-04-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project