200 MWh Bohot BESS Project
Sector: Energy Storage • Location: Bulgaria
Source: AOL
The 200 MWh Bohot Battery Energy Storage System (BESS) project in Bulgaria uses a modular architecture of DC battery cabins, integrated AC cabins and PCS units, paired with a 33 kV grid-interconnection system. It reached full-capacity grid connection in April 2026 and is now operating stably, having met Europe's stringent interconnection requirements and earned recognition from local partners and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The 200 MWh Bohot Battery Energy Storage System (BESS) project in Bulgaria uses a modular architecture of DC battery cabins, integrated AC cabins and PCS units, paired with a 33 kV grid-interconnection system. It reached full-capacity grid connection in April 2026 and is now operating stably, having met Europe's stringent interconnection requirements and earned recognition from local partners and regulators. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
