200 S Multi-Modal Roadway Improvements Phase 1
Sector: Water Supply and Storage • Location: American Fork, Utah, United States of America
Source: Dodge USA
The principal items of work are approximately as follows: Construct 200 South multi-modal roadway improvements from 270 West to 570 West Road (approximately 0.42 miles). Demolition work includes; demolition of existing asphalt pavement, concrete, utilities, and street signs, etc. New Construction work includes construction/installation of; asphalt pavement, concrete curb and gutter, concrete sidew
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Power Generation (CCGT)
- Location
- American Fork, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 200 S Multi-Modal Roadway Improvements Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The principal items of work are approximately as follows: Construct 200 South multi-modal roadway improvements from 270 West to 570 West Road (approximately 0.42 miles). Demolition work includes; demolition of existing asphalt pavement, concrete, utilities, and street signs, etc. New Construction work includes construction/installation of; asphalt pavement, concrete curb and gutter, concrete sidewalk, traffic signage, roadway striping, chain link fencing, storm drain pipe (12" RCP, 24"), stor... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | American Fork |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
