logo

200m-tall Wind Turbine at Meadowhead Industrial Estate

The owner, status and timeline of this project. A free account opens every field.

Source: Irvine Times

Project
Planned

A new 200m-high wind turbine is proposed at Irvine's Meadowhead Industrial Estate to power operations at the nearby GSK factory. The turbine will have an energy generating capacity of approximately 7MW, with construction expected to take around a year and an expected lifespan of 25 years. This turbine will be significantly taller than most others in Ayrshire and aims to help GSK move closer to net

Status
Prospective
Sector
Manufacturing (Industrial), Raw Materials, Power Generation (CCGT), Wind
Location
Irvine, Scotland, United Kingdom
Updated
22 Jul 2026
Source
Irvine Times

ConstructChat

Ask ConstructChat about 200m-tall Wind Turbine at Meadowhead Industrial Estate

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “200m-tall Wind Turbine at Meadowhead Industrial Estate” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Irvine, Scotland, United Kingdom. Taiyo aggregates data on it from Irvine Times.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A new 200m-high wind turbine is proposed at Irvine's Meadowhead Industrial Estate to power operations at the nearby GSK factory. The turbine will have an energy generating capacity of approximately 7MW, with construction expected to take around a year and an expected lifespan of 25 years. This turbine will be significantly taller than most others in Ayrshire and aims to help GSK move closer to net zero emissions.

Original sector

Energy

Location

Country

United Kingdom (UK)

State

Scotland

City

Irvine

Source

Source

Irvine Times

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Raw Materials, Power Generation (CCGT), Wind

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project