logo

2017 SSA Remedial Measures, Sub-Basin MC08

Sector: Water Supply and Storage • Location: Fort Smith, Arkansas, United States of America

Source: Dodge USA

Project
Closed

This project includes approximately 2,301 linear feet of 8-inch diameter and 92 linear feet of 12-inch diameter sanitary sewer line replacement by open cut methods; 2,166 linear feet of 8-inch sanitary sewer line replacement by pipe burst methods; 1,831 linear feet of 8-inch CIPP pipe lining; the installation of 114 clean outs; the replacement of 23 48-inch diameter manholes; the lining of 15 manh

Status
Closed
Sector
Water Supply and Storage, Commercial, Hospital, Government, Waste Processing and Treatment, Hotel
Location
Fort Smith, Arkansas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2017 SSA Remedial Measures, Sub-Basin MC08

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2017 SSA Remedial Measures, Sub-Basin MC08” is an infrastructure initiative in the Water Supply and Storage sector, located in Fort Smith, Arkansas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project includes approximately 2,301 linear feet of 8-inch diameter and 92 linear feet of 12-inch diameter sanitary sewer line replacement by open cut methods; 2,166 linear feet of 8-inch sanitary sewer line replacement by pipe burst methods; 1,831 linear feet of 8-inch CIPP pipe lining; the installation of 114 clean outs; the replacement of 23 48-inch diameter manholes; the lining of 15 manholes; and the replacement of 9 manhole frame and covers.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arkansas

City

Fort Smith

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Hospital, Government, Waste Processing and Treatment, Hotel

Article published date

2024-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project