2019 Rout & Seal Program
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Dodge USA
The Contractor shall perform routing and sealing operations as per OPSS 341. The contractor shall use the standard 20mm wide by 20mm deep rout cross section for all cracks that must be routed. Cracks greater than 20mm in aperture and longitudinal cracks in fully or partially-paved shoulders within 150mm of the pavement edge, shall be sealed without routing
- Status
- Prospective
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- London, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2019 Rout & Seal Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall perform routing and sealing operations as per OPSS 341. The contractor shall use the standard 20mm wide by 20mm deep rout cross section for all cracks that must be routed. Cracks greater than 20mm in aperture and longitudinal cracks in fully or partially-paved shoulders within 150mm of the pavement edge, shall be sealed without routing |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | London |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
