logo
ProjectStart

2019 Water Main Renewals - Contract No.4

Sector: Water Supply and Storage • Location: Winnipeg, Manitoba, Canada

Source: Dodge USA

The Work to be done under the Contract shall consist of the installation and abandonment ofwater mains in the Point Douglas, Fort Rouge, Tuxedo and St.Vital areas of the City ofWinnipeg.D2.2 The majorcomponents of the Work are as follows:(a) Installation of approximately820m of 150 to 400mm diameter PVC water main pipe bytrenchless method;(b) Abandonment of existing water mains as required;(c) Rem

Status
Prospective
Sector
Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
Location
Winnipeg, Manitoba, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2019 Water Main Renewals - Contract No.4

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2019 Water Main Renewals - Contract No.4” is an infrastructure initiative in the Water Supply and Storage sector, located in Winnipeg, Manitoba, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Work to be done under the Contract shall consist of the installation and abandonment ofwater mains in the Point Douglas, Fort Rouge, Tuxedo and St.Vital areas of the City ofWinnipeg.D2.2 The majorcomponents of the Work are as follows:(a) Installation of approximately820m of 150 to 400mm diameter PVC water main pipe bytrenchless method;(b) Abandonment of existing water mains as required;(c) Removal/abandonment of existing hydrant assemblies and gate valves as required;(d) Installation of v...

Procurement method

Location

Country

Canada

State

Manitoba

City

Winnipeg

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Waste Processing and Treatment

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project